Using an Ice bath approximately 70% ice 30% water, place the pipe clamp in the ice water and stir for approx. 15-20 seconds. Below the SLT and LLT port there is a black screw that can be turned clockwise to bring the temp up and counterclockwise to bring the temp down.
 
                 
                 
                 
                 
              


 English
 English French
 French Spanish
 Spanish



























